Work is progressing on the office space - the latest renderings by Doug Wagner of ModernFab are below.
Besides reusing shipping containers, the windows and doors are salvaged, the wood for the mezzanine decking is reclaimed, the infill for the guardrails will be a 65% recycled stainless steel cable system, and the steel purchased for the doors, windows, stairs, rails and mezzanine joists are all made from recycled steel. A huge thanks to Doug for the design layout and all the work on gathering materials as well as the project management.




RSS Feed